Lou Perez
•
Nov 13, 2026

Year-End Close Checklist for Construction: Payroll, Benefits and HR

Year-end Audit
Experience the future of construction workforce management with Lumber
Talk to our expert

The last payroll of December is often the most expensive one to get wrong. A bonus check dated January 2 lands in the wrong tax year. A fringe remittance that never reached the fund turns into a delinquency notice. An address nobody updated sends a W-2 back to the office in February.

Year-end in construction isn't one deadline. It's dozens, spread across payroll, benefits, and HR, and most depend on each other. A late benefits handoff becomes a wrong deduction on the first January check. A missed wage determination update becomes a back-wage finding on a prevailing wage job.

The 2026 close also brings new work. W-2s now carry a separate code for qualified overtime, the 1099-NEC threshold moved, and federal certified payroll now runs on the revised WH-347. This guide walks through a complete year-end checklist by team, flags what's new this year, and shows where each handoff happens.

The full checklist is available as a free download, with an owner and due date column for every task. Use it two ways:

  • Review where you stand. Walk each section with your team and mark what's already done. The gaps tell you where to focus before the last payroll of the year.
  • Action what's left. Assign an owner and a due date to every open task, then work it down. Check off each box as tasks close.
Download the Year-End Close Checklist for Construction. It works with any payroll and HR system, and tasks marked "New" cover the federal changes for the 2026 close.

Key Takeaways

  • Payroll owns the numbers on every W-2, so lock the processing calendar, clean up employee data, and reconcile wages, taxes, and benefits before sending forms.
  • The check date, not the work period, decides which tax year wages belong to.
  • Taxable fringe benefits such as personal use of company vehicles and group-term life over $50,000 must be in wages before the final payroll.
  • Union and prevailing wage work needs its own close: fund remittances, union reciprocity, new CBA rates, wage determination updates, and certified payroll filed through year-end.
  • New for tax year 2026: qualified overtime goes in W-2 Box 12, Code TT, and only the FLSA-required overtime premium counts. Overtime owed only under a CBA or state law does not.
  • Form 1099-NEC reporting starts at $2,000 for payments made in 2026, and both W-2s and 1099-NECs are due February 1, 2027.
  • Benefits must hand payroll new premiums, effective dates, and contribution limits before the first January check.
  • HR sets the rules the new year runs on: policies, January 1 law changes, classifications, OSHA 300A, and clean records.

Payroll Year-End Checklist: Lock the Numbers Before W-2s Go Out

Payroll owns the numbers that end up on every W-2. The downloadable checklist breaks payroll into seven groups, plus the first January payroll. Here is what each group covers and where construction teams most often slip.

Software and calendar

Get your software's year-end guide and last-payroll cutoff, set December processing and funding deadlines around the holidays, and generate next year's pay schedule. The check date, not the work period, sets the tax year. Watch for years with 27 biweekly or 53 weekly pay periods.

Employee data

Verify names and SSNs with SSA's SSNVS, confirm home addresses and work locations, and review multi-state and remote employees for state tax reciprocity. Crews that travel across state lines deserve a second look. Employees who claimed exempt on their W-4 must submit a new one by February 15.

Earnings and taxable fringe benefits

Here, "taxable fringe" means benefits the IRS treats as wages, not union fringe benefit contributions. Bonuses, retro pay, group-term life over $50,000, non-accountable allowances, and health premiums for 2%+ S-corp shareholders must all be included in wages before the last payroll.

Practical tip: Take-home pickups are the item construction payroll teams miss most. Unless a vehicle qualifies for an exclusion under IRS Publication 15-B, personal and commuting use is taxable wages.

Reconciliation

Reconcile year-to-date wages and taxes by employee first, then by jurisdiction, then to benefit deductions and the general ledger. Confirm Social Security stopped at the 2026 wage base of $184,500 and Additional Medicare started at $200,000. Tie every Box 12 code to its source report, including the new Code TT.

Tax accounts

Confirm every state and local tax account is active with no "applied for" placeholders, close accounts in states with no remaining employees, and budget for FUTA credit reductions.

Compliance note: For 2026, the Department of Labor listed California and the U.S. Virgin Islands as potential FUTA credit reduction jurisdictions. The Virgin Islands repaid its outstanding loans in June 2026. California's potential reduction ranges from 1.5% to 5.3% of FUTA wages, depending on whether a benefit cost rate add-on applies. Confirm the final list on the DOL FUTA credit reduction page before you budget.

Union payroll

Reconcile fringe and dues remittances to each fund and clear any delinquency notices. Confirm union reciprocity and where travelers' fringes are remitted, load new wage and fringe rates effective January 1, and check the tax treatment of vacation and holiday funds paid through payroll.

Prevailing wage

Confirm certified payroll is filed through year-end, check active projects for wage determination updates, and archive certified payrolls for finished jobs. Also review fringe credit annualization. That means dividing a year's plan contributions by all hours worked, on public and private jobs, to find the hourly credit you can claim on the prevailing wage job.

Where Lumber helps: Lumber runs payroll, tax filing, union payroll, and certified payroll in one system, so reconciliation starts from a single source of truth instead of three spreadsheets.

What's New for the 2026 Close: Items to Add to Your Checklist

Three federal changes add tasks to this year's close, and each one hits construction harder than most industries.

Qualified overtime now has its own W-2 code

Starting with tax year 2026, employers must report qualified overtime compensation separately in W-2 Box 12 using Code TT. Qualified overtime is only the premium portion of overtime that Section 7 of the Fair Labor Standards Act (FLSA) requires. For most crews, that is half the FLSA regular rate for each hour over 40 in a workweek.

The IRS is clear that overtime paid only because a collective bargaining agreement, state law, or company policy requires it is not qualified overtime. That matters on construction crews. CBA daily overtime, double time on weekends, and state daily overtime rules can all create overtime pay that does not belong in Code TT. An error in Code TT requires a Form W-2c.

  • New: Map every overtime earning code as FLSA-required or CBA, state law, or policy overtime.
  • New: Calculate qualified overtime from FLSA hours over 40 and the FLSA regular rate.
  • New: Review Code TT totals in the W-2 preview before filing.

The 1099-NEC threshold moved to $2,000

For payments made in 2026, Form 1099-NEC and many Form 1099-MISC reporting requirements start at $2,000 instead of $600. The threshold is indexed for inflation starting in 2027. Contractors that pay subcontractors, equipment operators, or consultants should total 2026 payments by payee before January.

  • New: Confirm a current W-9 is on file for every subcontractor and vendor.
  • New: Total 2026 payments by payee against the $2,000 threshold, and check whether your states follow the federal threshold.
  • New: Furnish and file Forms 1099-NEC by February 1, 2027.

Federal certified payroll runs on the revised WH-347

The Department of Labor released a revised WH-347 in January 2025, approved through January 31, 2028. The previous version expired September 30, 2026. The revised form asks for more detail on how fringe benefits were paid, so year-end is a good time to confirm every active federal job uses it. Lumber's guide on how to fill out the WH-347 walks through the new fields.

First January Payroll: Confirm the New Year Before You Approve

The first January payroll proves whether the close worked. Confirm the software applied new tax tables and wage bases, including the 2027 Social Security wage base of $192,300. Enter new SUI, SDI, and paid family leave rates, then load new pay rates: merit increases, minimum wage changes, CBA, and prevailing wage rates. Check that new benefit deductions and retirement limits are in place and that year-to-date accumulators reset. Then compare the first January payroll register to the final December payroll register before anyone approves it.

Benefits Year-End Checklist: Close the Plan Year and Hand Off to Payroll

Benefits closes the plan year and hands payroll the numbers for the next one. Miss a handoff here, and it shows up as a wrong deduction on the first January check.

Open enrollment and plan year

Close open enrollment, audit elections and dependents, and confirm carriers processed enrollment files, including EDI feeds. The critical handoff is giving payroll new employee and employer premiums with January effective dates.

Accounts and retirement

Confirm payroll software has new-year limits for 401(k), catch-up, HSA, FSA, dependent care, and commuter benefits once the IRS publishes them. Coordinate the true-up match, nondiscrimination testing data, and any Roth catch-up requirement with your recordkeeper. Nondiscrimination testing checks that a plan does not favor highly compensated employees, and payroll supplies the data.

Reconciliation and reporting

Reconcile carrier invoices to enrollment, give payroll group-term life imputed income, and confirm ACA measurement period results for variable-hour employees. Applicable large employers should also prepare Forms 1094-C and 1095-C. Calendar the Medicare Part D disclosure to CMS, Form 5500, and the PCORI fee.

Where Lumber helps: With benefits administration and payroll on the same platform, elections and deductions stay in sync—no re-keying premiums from one system into another.

HR Year-End Checklist: Set the Rules the New Year Runs On

HR sets the rules the new year runs on: policies, compliance updates, and clean records for every crew member.

Policies and calendars

Review PTO and sick leave policies for carryover caps, payout rules, and state and city changes, then tell employees how balances will roll over. Publish next year's holiday calendar, load it into the software, and send it to payroll. Update the handbook and collect acknowledgments.

Compliance

Minimum wage, sick leave, and exempt salary thresholds vary by state and city, and many change on January 1, so verify current figures with each state labor department. Re-check exempt classifications, which now also drive W-2 Code TT reporting, and review contractor classifications against employee tests.

Compliance note: Construction is on OSHA's list of higher-hazard industries. Establishments with 20 to 249 employees in those industries, and establishments with 250 or more employees, must submit Form 300A data through OSHA's Injury Tracking Application by March 2. Size is counted per establishment, not company-wide.

Records and people processes

Audit employee files and I-9s, confirm job titles and work locations, and send approved merit, promotion, and bonus changes to payroll with effective dates. Remove departed users from software access, and note this year's issues so next year's close runs faster.

Where Lumber helps: Lumber keeps onboarding, credentials, time-off policies, and employee records in the same system your crews clock in to, so changes made in HR reach the field and payroll in real time.

Key Year-End Deadlines for Early 2027

This table compares the main federal filings after the 2026 close, along with the team that usually owns each one.

                                                                                                                                                                                                                                       
Filing or TaskDeadlineOwnerNotes
Form W-2February 1, 2027PayrollFurnish to employees and file with SSA; first year with Code TT
Form 1099-NECFebruary 1, 2027Payroll or Accounts Payable$2,000 threshold for 2026 payments
Form 940 and Q4 Form 941February 1, 2027PayrollFebruary 10 if all taxes were deposited on time
New W-4 from exempt employeesFebruary 15, 2027PayrollCheck state deadlines too
OSHA Form 300A postingFebruary 1 through April 30, 2027HR or SafetyPost at each establishment
OSHA Form 300A electronic submissionMarch 2, 2027HR or SafetyConstruction establishments with 20 or more employees

‍

January 31, 2027 falls on a Sunday, so the W-2, 1099-NEC, and Form 940/941 deadlines move to Monday, February 1. State deadlines vary, so confirm each state you file in.

Frequently Asked Questions

When should construction companies start year-end payroll prep?

Start in October or early November, well before the last payroll of December. The calendar items come first: get your software's year-end cutoff, set December processing and funding deadlines around the holidays, and confirm the final check date lands in the right tax year. Employee data cleanup, such as SSN verification and address updates, takes weeks because it depends on employees responding. Union and prevailing wage reconciliations also take time because they involve outside funds and agencies. Waiting until late December leaves no room to fix negative wages, wrong-state postings, or missed taxable fringe benefits before W-2s are due on February 1, 2027.

Does union overtime count as qualified overtime for W-2 Code TT?

Only the part the FLSA requires. Qualified overtime is the premium portion of overtime required by Section 7 of the FLSA, generally half the regular rate for hours over 40 in a workweek. If a CBA requires daily overtime after eight hours, or double time on Saturdays, the premium paid only because of the CBA is not qualified overtime. The same rule applies to overtime owed only under state law, such as daily overtime rules. Union payroll teams should split overtime earning codes by source so the W-2 shows the correct Code TT amount. An employee who is exempt under the FLSA has no qualified overtime, even if a CBA pays them overtime.

Do I need to send a Form 1099-NEC to every subcontractor for 2026?

No. For payments made in 2026, you generally need to issue Form 1099-NEC only when you paid a nonemployee $2,000 or more for services during the year, up from $600. The threshold applies per payee, so total each subcontractor's 2026 payments before deciding. Some states have not matched the federal change, so check your state filing rules separately. Collect W-9s now, even for subs below the threshold, because payments can cross $2,000 late in the year. You must send Forms 1099-NEC for 2026 to recipients and the IRS by February 1, 2027.

What happens if a W-2 is wrong after it has been filed?

You file Form W-2c with the Social Security Administration and give a corrected copy to the employee. Common reasons include incorrect wages, the wrong state, a missing taxable fringe benefit, or, starting with 2026 forms, an incorrect Code TT amount. Corrections take time and frustrate employees during tax season, which is why the reconciliation steps in this checklist matter. Validate W-2 data with a W-2 preview before filing, tie Box 12 codes to deduction and benefit reports, and confirm Social Security stopped at the wage base. Most W-2c filings trace back to issues that a December reconciliation would have caught.

Ready for January 2027

A clean construction year-end close comes down to three teams finishing their own work and handing off on time. Payroll locks the calendar, cleans up data, and reconciles every number that lands on a W-2. Benefits closes the plan year and gives payroll new premiums and limits. HR sets the policies and classifications the new year runs on.

This year adds three items to the list: Code TT for qualified overtime, the $2,000 Form 1099-NEC threshold, and the revised WH-347 for federal certified payroll.

Your next steps:

  1. Download the checklist and assign an owner and due date to every open task this week.
  2. Split overtime earning codes into FLSA-required and CBA or state law overtime.
  3. Total 2026 subcontractor payments and confirm W-9s are on file.
  4. Compare the first January payroll register to December's before you approve it.

Every box checked means a cleaner W-2 season, fewer amended filings, and a first January payroll you can approve without holding your breath. Keep your notes from this close. They're the fastest way to make next year's even smoother.

Want a second set of eyes? Lumber is built for construction, with a support crew of CPAs and prevailing wage specialists who work year-end alongside contractors every season. Reach out to your Lumber contact or visit lumberfi.com to talk through your year-end close.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Donec ullamcorper mattis lorem non. Ultrices praesent amet ipsum justo massa. Eu dolor aliquet risus gravida nunc at feugiat consequat purus. Non massa enim vitae duis mattis. Vel in ultricies vel fringilla.

Introduction

Mi tincidunt elit, id quisque ligula ac diam, amet. Vel etiam suspendisse morbi eleifend faucibus eget vestibulum felis. Dictum quis montes, sit sit. Tellus aliquam enim urna, etiam. Mauris posuere vulputate arcu amet, vitae nisi, tellus tincidunt. At feugiat sapien varius id.
‍
Eget quis mi enim, leo lacinia pharetra, semper. Eget in volutpat mollis at volutpat lectus velit, sed auctor. Porttitor fames arcu quis fusce augue enim. Quis at habitant diam at. Suscipit tristique risus, at donec. In turpis vel et quam imperdiet. Ipsum molestie aliquet sodales id est ac volutpat.

Ipsum sit mattis nulla quam nulla. Gravida id gravida ac enim mauris id. Non pellentesque congue eget consectetur turpis. Sapien, dictum molestie sem tempor. Diam elit, orci, tincidunt aenean tempus. Quis velit eget ut tortor tellus. Sed vel, congue felis elit erat nam nibh orci.

“In a world older and more complete than ours they move finished and complete, gifted with extensions of the senses we have lost or never attained, living by voices we shall never hear.”
Lou Perez
Co-founder

Dolor enim eu tortor urna sed duis nulla. Aliquam vestibulum, nulla odio nisl vitae. In aliquet pellentesque aenean hac vestibulum turpis mi bibendum diam. Tempor integer aliquam in vitae malesuada fringilla.
‍
Elit nisi in eleifend sed nisi. Pulvinar at orci, proin imperdiet commodo consectetur convallis risus. Sed condimentum enim dignissim adipiscing faucibus consequat, urna. Viverra purus et erat auctor aliquam. Risus, volutpat vulputate posuere purus sit congue convallis aliquet. Arcu id augue ut feugiat donec porttitor neque. Mauris, neque ultricies eu vestibulum, bibendum quam lorem id. Dolor lacus, eget nunc lectus in tellus, pharetra, porttitor.

Ipsum sit mattis nulla quam nulla. Gravida id gravida ac enim mauris id. Non pellentesque congue eget consectetur turpis. Sapien, dictum molestie sem tempor. Diam elit, orci, tincidunt aenean tempus. Quis velit eget ut tortor tellus. Sed vel, congue felis elit erat nam nibh orci.

Software and tools

Mi tincidunt elit, id quisque ligula ac diam, amet. Vel etiam suspendisse morbi eleifend faucibus eget vestibulum felis. Dictum quis montes, sit sit. Tellus aliquam enim urna, etiam. Mauris posuere vulputate arcu amet, vitae nisi, tellus tincidunt. At feugiat sapien varius id.
‍
Eget quis mi enim, leo lacinia pharetra, semper. Eget in volutpat mollis at volutpat lectus velit, sed auctor. Porttitor fames arcu quis fusce augue enim. Quis at habitant diam at. Suscipit tristique risus, at donec. In turpis vel et quam imperdiet. Ipsum molestie aliquet sodales id est ac volutpat.

Other resources

Mi tincidunt elit, id quisque ligula ac diam, amet. Vel etiam suspendisse morbi eleifend faucibus eget vestibulum felis. Dictum quis montes, sit sit. Tellus aliquam enim urna, etiam. Mauris posuere vulputate arcu amet, vitae nisi, tellus tincidunt. At feugiat sapien varius id.
‍
Eget quis mi enim, leo lacinia pharetra, semper. Eget in volutpat mollis at volutpat lectus velit, sed auctor. Porttitor fames arcu quis fusce augue enim. Quis at habitant diam at. Suscipit tristique risus, at donec. In turpis vel et quam imperdiet. Ipsum molestie aliquet sodales id est ac volutpat.

  • Lectus id duis vitae porttitor enim gravida morbi.
  • Eu turpis posuere semper feugiat volutpat elit, ultrices suspendisse. Auctor vel in vitae placerat.
  • Suspendisse maecenas ac donec scelerisque diam sed est duis purus.

Lectus leo massa amet posuere. Malesuada mattis non convallis quisque. Libero sit et imperdiet bibendum quisque dictum vestibulum in non. Pretium ultricies tempor non est diam. Enim ut enim amet amet integer cursus. Sit ac commodo pretium sed etiam turpis suspendisse at.
‍
Tristique odio senectus nam posuere ornare leo metus, ultricies. Blandit duis ultricies vulputate morbi feugiat cras placerat elit. Aliquam tellus lorem sed ac. Montes, sed mattis pellentesque suscipit accumsan. Cursus viverra aenean magna risus elementum faucibus molestie pellentesque. Arcu ultricies sed mauris vestibulum.

Close 2026 with every payroll, benefits and HR task in one place.
Download the Checklist
Download the Checklist
Mandatory Deadlines | Internal Review/Best Practice 
Critical Construction Compliance | Awareness Week
January 2026
Jan 2, 7, 9, 14, 16, 21, 23, 28 & 30
Semi-Weekly Federal Tax Deposit Due
Sat-Tue wages → Friday deposit; Wed-Fri wages → Wednesday deposit
Thursday, Jan 15, 2026
Deadline for December 2025 Monthly Depositor Tax Liabilities
Monday, Feb 2, 2026
(Standard Jan 31 deadline shifted to next business day as it falls on a weekend)
1. File Form 941 (Employer's Quarterly Federal Tax Return) for Q4 2025
2. Distribute Form W-2s to employees for 2025
3. Distribute Form 1099-NEC to subcontractors for 2025
4. File Form W-2s with the Social Security Administration (SSA)
5. File Form 1099-NEC with IRS
6. File Form 1096 (summary of 1099s)
7. State Unemployment and Quarterly Wage Reports for Q4 2025
These reports are typically due Jan 31. Verify state-specific deadlines and file accordingly.
Annual Depositor Deadline (Form 944 Filers)
Annual depositors must file Form 944 and deposit taxes with the return by this date. 
February 2026
Feb 4, 6, 11, 13, 18, 20, 25 & 27
Semi-Weekly Federal Tax Deposit Due
Sat-Tue wages → Friday deposit; Wed-Fri wages → Wednesday deposit
Tuesday, Feb 10, 2026
Extended deadline to file Form 941 (Q4 2025)
Only if all Q4 2025 federal tax deposits were made on time.
Tuesday, Feb 17, 2026
Deadline for January Monthly Depositor tax liabilities
(Feb 15 is a Sunday and Feb 16 is President’s Day)
March 2026
Mar 4, 6, 11, 13, 18, 20, 25 & 27
Semi-Weekly Federal Tax Deposit Due
Sat-Tue wages → Friday deposit; Wed-Fri wages → Wednesday deposit
Monday, Mar 2, 2026
File Form 1099-MISC with the IRS (paper filing)
(Standard Feb 28 deadline shifted to next business day)
Monday,
Mar 16, 2026
Deadline for Feb Monthly Depositor tax liabilities
April 2026
Apr 1, 3, 8, 10, 15, 17, 22, 24 & 29
Semi-Weekly Federal Tax Deposit Due
Sat-Tue wages → Friday deposit; Wed-Fri wages → Wednesday deposit
Wednesday
Apr 15, 2026
Deadline for March Monthly Depositor tax liabilities 
Thursday, Apr 30, 2026
1. File Form 941 for Q1 2026
2. File State Quarterly Wage Reports (Verify state-specific deadlines)
Internal Compliance Review: Review certified payroll reports and compliance for Q1.
Certified payroll reports are due WEEKLY for prevailing wage projects.
May 2026
May 1, 6, 8, 13, 15, 20, 22, 27 & 29
Semi-Weekly Federal Tax Deposit Due
Sat-Tue wages → Friday deposit; Wed-Fri wages → Wednesday deposit
Friday, May 15, 2026
Deadline for April Monthly Depositor tax liabilities
June 2026
Jun 3, 5, 10, 12, 17, 19, 24 & 26
Semi-Weekly Federal Tax Deposit Due
Sat-Tue wages → Friday deposit; Wed-Fri wages → Wednesday deposit
Monday, Jun 15, 2026
Deadline for May Monthly Depositor tax liabilities 
Tuesday, Jun 30, 2026
1. Mid-year review of workers' compensation insurance
2. Review certified payroll compliance for prevailing wage projects
Certified payroll reports are due WEEKLY for prevailing wage projects.
July 2026
Jul 1, 3, 8, 10, 15, 17, 22, 24, 29 & 31
Semi-Weekly Federal Tax Deposit Due
Sat-Tue wages → Friday deposit; Wed-Fri wages → Wednesday deposit
Wednesday, Jul 15, 2026
Deadline for June Monthly Depositor tax liabilities 
Friday, Jul 31, 2026
1. File Form 941 for Q2 2026
2. File state quarterly wage reports (Verify state-specific deadlines)
3. Review and update fringe benefit rates for union projects
August 2026
Aug 5, 7, 12, 14, 19, 21, 26 & 28
Semi-Weekly Federal Tax Deposit Due
Sat-Tue wages → Friday deposit; Wed-Fri wages → Wednesday deposit
Monday, Aug 17, 2026
Deadline for July Monthly Depositor tax liabilities 
(Aug 15 is a Saturday)
September 2026
Sep 2, 4, 9, 11, 16, 18, 23, 25 & 30
Semi-Weekly Federal Tax Deposit Due
Sat-Tue wages → Friday deposit; Wed-Fri wages → Wednesday deposit
Sep 7 - Sep 11, 2025
National Payroll Week
Take a moment to appreciate yourself this week. You deserve it.
Tuesday, Sep 15, 2026
Deadline for August Monthly Depositor tax liabilities 
Wednesday Sep 30, 2026
1. Review job costing and labor burden rates
2. Prepare for year-end certified payroll audits
October 2026
Oct 2, 7, 9, 14, 16, 21, 23, 28 & 30
Semi-Weekly Federal Tax Deposit Due
Sat-Tue wages → Friday deposit; Wed-Fri wages → Wednesday deposit
Thursday, Oct 15, 2026
Deadline for September Monthly Depositor tax liabilities 
November 2026
Nov 4, 6, 11, 13, 18, 20, 25 & 27
Semi-Weekly Federal Tax Deposit Due
Sat-Tue wages → Friday deposit; Wed-Fri wages → Wednesday deposit
Monday, Nov 2, 2026
1. File Form 941 for Q3 2026
2. File state quarterly wage reports (Verify state-specific deadlines)

Monday, Nov 16, 2026
Deadline for October Monthly Depositor tax liabilities 
(Nov 15 is a Sunday)
Monday,
Nov 30, 2026
Year-End Preparation:
1. Order W-2 and 1099 forms for year-end
2. Review subcontractor W-9s and update as needed
December 2026
Dec 2, 4, 9, 11, 16, 18, 23, 28 & 30
Semi-Weekly Federal Tax Deposit Due
Sat-Tue wages → Friday deposit; Wed-Fri wages → Wednesday deposit
Tuesday,
Dec 15, 2026

1. Final payroll of the year - verify all hours and classifications
2. Ensure all certified payroll reports are submitted for prevailing wage work
Certified payroll reports are due WEEKLY for prevailing wage projects.
3. Complete year-end workers' compensation audit paperwork
Latest posts

Essential resources for contractors

Interviews, tips, guides, industry best practices, and news.
Lou Perez
•
Nov 13, 2026

HRIS for Construction Companies: What to Look for When Payroll Gets Complicated

No items found.
•
Nov 11, 2026

Construction Labor Costs in 2027: What the Latest Federal Data Means for Your Budget

No items found.
Lou Perez
•
Oct 23, 2026

How to Track PTO Accruals and Balances Without Manual Spreadsheets

Payroll
Supercharge your construction workforce
Talk to our Lumber expert to get started.
Book a demo